Muaitheabhal 132/33kV: grid connection queue

Muaitheabhal 132/33kV Substation · SSEN Transmission (northern Scotland) · register of 26 November 2026

1 project with 189 MW is waiting to connect here (largest by capacity: mixed and other). Contracted dates run from 31 Dec 2030 to 31 Dec 2030.

1project in the queue
189 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Muaitheabhal Wind FarmUISENIS POWER LIMITEDMixed and other18931 Dec 2030Medium31 Dec 2030Consents Approvednone

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Laxay PrimarySSEN Distribution9.7 km0 MW1.2 MW
Maaruig PrimarySSEN Distribution11.9 km0 MW0 MW
Tarbert PrimarySSEN Distribution18.9 km0 MW2.3 MW

Thinking of connecting near Muaitheabhal 132/33kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.