Lunanhead: grid connection queue
Lunanhead GSP · SSEN Transmission (northern Scotland) · register of 26 November 2026
1 project with 34 MW is waiting to connect here (largest by capacity: solar + storage). Contracted dates run from 31 Oct 2026 to 31 Oct 2026.
What sits in the queue
Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).
| Project | Customer | Type | MW | Contracted date | Date risk | Likely date | Stage | Gate |
|---|---|---|---|---|---|---|---|---|
| Montreathmont Moor Forest | Montreathmont Energy Centre Limited | Solar + storage | 34 | 31 Oct 2026 | n/a | Consents Approved | 2 |
Dates that moved
Since 2 Jun 2026, connection dates here moved by a month or more 1 time: 0 later and 1 earlier. An earlier date can mean someone ahead dropped out or the queue was re-ordered.
| Week seen | Project | Was | Now | Change |
|---|---|---|---|---|
| 20 Oct 2026 | Montreathmont Moor Forest | 8 Oct 2029 | 31 Oct 2026 | -35 months |
Local network capacity nearby
Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.
| Substation | Operator | Distance | Generation headroom | Demand headroom |
|---|---|---|---|---|
| Maryton Primary | SSEN Distribution | 6.2 km | 0 MW | 7.4 MW |
| Lochside Primary | SSEN Distribution | 10.2 km | 0 MW | 7.5 MW |
| Lunanhead Primary | SSEN Distribution | 10.4 km | 0 MW | 7.2 MW |
| Lunanhead GSP | SSEN Distribution | 10.4 km | ||
| Inverarity Primary | SSEN Distribution | 15.8 km | 0 MW | 2.3 MW |
| Alyth Primary | SSEN Distribution | 19.6 km | 0 MW | 2.9 MW |
Thinking of connecting near Lunanhead?
Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.
Ask for a free check See a sample reportPaid screening reports from £1,950. Queue watch alerts you when anything here changes.
Nearby connection points
- Lunanhead 2: 50 MW waiting
- Alyth 400kV: 1,124 MW waiting
- Alyth Solar and Battery 400/132kV: 900 MW waiting
- ALYTH BESS STATION 400KV SUBSTATION: 500 MW waiting
- Bridge of Dun: 50 MW waiting