Benzene

Lunanhead 2: grid connection queue

Lunanhead 2 GSP · SSEN Transmission (northern Scotland) · register of 26 November 2026

1 project with 50 MW is waiting to connect here (largest by capacity: battery storage). Contracted dates run from 31 Oct 2032 to 31 Oct 2032.

1project in the queue
50 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Carseview Road BESSVital Energi Solutions LimitedBattery storage5031 Oct 2032Low31 Oct 2032Scopingnone

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Maryton PrimarySSEN Distribution6.2 km0 MW7.4 MW
Lochside PrimarySSEN Distribution10.2 km0 MW7.5 MW
Lunanhead PrimarySSEN Distribution10.4 km0 MW7.2 MW
Lunanhead GSPSSEN Distribution10.4 km
Inverarity PrimarySSEN Distribution15.8 km0 MW2.3 MW
Alyth PrimarySSEN Distribution19.6 km0 MW2.9 MW

Thinking of connecting near Lunanhead 2?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points