Loch na Cathrach 275kV Switching Station: grid connection queue
Loch na Cathrach 275kV Switching Station · SSEN Transmission (northern Scotland) · register of 26 November 2026
1 project with 550 MW is waiting to connect here (largest by capacity: hydro, pumped storage and tidal). Contracted dates run from 28 Jun 2030 to 28 Jun 2030.
What sits in the queue
Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).
| Project | Customer | Type | MW | Contracted date | Date risk | Likely date | Stage | Gate |
|---|---|---|---|---|---|---|---|---|
| Loch na Cathrach Pumped Storage Hydro | STATKRAFT HIGHLANDS PSH LIMITED | Hydro, pumped storage and tidal | 550 | 28 Jun 2030 | Medium | 28 Jun 2030 | Consents Approved | 2 |
Dates that moved
Since 2 Jun 2026, connection dates here moved by a month or more 2 times: 2 later and 0 earlier. An earlier date can mean someone ahead dropped out or the queue was re-ordered.
| Week seen | Project | Was | Now | Change |
|---|---|---|---|---|
| 10 Nov 2026 | Loch na Cathrach Pumped Storage Hydro | 30 Apr 2029 | 28 Jun 2030 | +14 months |
| 10 Nov 2026 | Loch na Cathrach Pumped Storage Hydro | 31 Oct 2030 | 17 Nov 2031 | +12 months |
Local network capacity nearby
Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.
| Substation | Operator | Distance | Generation headroom | Demand headroom |
|---|---|---|---|---|
| Inverarnie Primary | SSEN Distribution | 9.0 km | 0 MW | 0 MW |
| Drumnadrochit Primary | SSEN Distribution | 10.2 km | 0 MW | 2 MW |
| Errogie Primary | SSEN Distribution | 10.7 km | 0 MW | 0 MW |
| Inverness GSP | SSEN Distribution | 11.0 km | ||
| Inverness Primary | SSEN Distribution | 11.0 km | 0 MW | 0 MW |
| Hilton Primary | SSEN Distribution | 12.6 km | 0 MW | 0 MW |
Thinking of connecting near Loch na Cathrach 275kV Switching Station?
Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.
Ask for a free check See a sample reportPaid screening reports from £1,950. Queue watch alerts you when anything here changes.
Nearby connection points
- INVERNESS 132/33KV GRID SUPPLY POINT SUBSTATION: 45 MW waiting
- Loch Liath 132/33kV: 99 MW waiting
- Knocknagael 132kV: 350 MW waiting
- Aberarder Extension Wind Farm 132/33kV: 138 MW waiting
- Aberarder Wind Farm 132/33kV: 50 MW waiting