Knocknagael 132kV: grid connection queue

Knocknagael 132kV Substation · SSEN Transmission (northern Scotland) · register of 26 November 2026

2 projects with 350 MW are waiting to connect here (largest by capacity: battery storage). Contracted dates run from 30 Jul 2029 to 31 Oct 2032.

2projects in the queue
350 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
2date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Knocknagael BESSFIELD KNOCKNAGAEL LTDBattery storage20030 Jul 2029Medium30 Jul 2029Awaiting Consents1
Balrobert Farm BESSELGIN ENERGY ES CO LIMITEDBattery storage15031 Oct 2032Low31 Oct 2032Scoping1

Dates that moved

Since 2 Jun 2026, connection dates here moved by a month or more 2 times: 1 later and 1 earlier. An earlier date can mean someone ahead dropped out or the queue was re-ordered.

Week seenProjectWasNowChange
20 Oct 2026Knocknagael BESS30 Jun 202930 Jul 2029+1 months
13 Oct 2026Knocknagael BESS31 Oct 203030 Jun 2029-16 months

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Hilton PrimarySSEN Distribution1.4 km0 MW0 MW
Inverness PrimarySSEN Distribution2.0 km0 MW0 MW
Inverness GSPSSEN Distribution2.0 km
Raigmore PrimarySSEN Distribution3.1 km0 MW0 MW
Dalneigh PrimarySSEN Distribution3.4 km0 MW0 MW
Waterloo Place PrimarySSEN Distribution4.0 km0 MW0 MW

Thinking of connecting near Knocknagael 132kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points