Highland BESS 132kV: grid connection queue
Highland BESS 132kV Substation · SSEN Transmission (northern Scotland) · register of 26 November 2026
1 project with 120 MW is waiting to connect here (largest by capacity: battery storage). Contracted dates run from 30 May 2030 to 30 May 2030.
What sits in the queue
Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).
| Project | Customer | Type | MW | Contracted date | Date risk | Likely date | Stage | Gate |
|---|---|---|---|---|---|---|---|---|
| Highland BESS | Apatura Battery Ltd | Battery storage | 120 | 30 May 2030 | Medium | 30 May 2030 | Scoping | 1 |
Dates that moved
No connection date here has moved by a month or more since 2 Jun 2026.
Local network capacity nearby
Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.
| Substation | Operator | Distance | Generation headroom | Demand headroom |
|---|---|---|---|---|
| Waterloo Place Primary | SSEN Distribution | 0.2 km | 0 MW | 0 MW |
| Longman Drive Primary | SSEN Distribution | 1.1 km | 0 MW | 0 MW |
| Dalneigh Primary | SSEN Distribution | 1.3 km | 0 MW | 0 MW |
| Raigmore Primary | SSEN Distribution | 2.4 km | 0 MW | 0 MW |
| Hilton Primary | SSEN Distribution | 2.8 km | 0 MW | 0 MW |
| North Kessock Primary | SSEN Distribution | 2.9 km | 0 MW | 0 MW |
Thinking of connecting near Highland BESS 132kV?
Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.
Ask for a free check See a sample reportPaid screening reports from £1,950. Queue watch alerts you when anything here changes.
Nearby connection points
- Highland Wind Farm 132/33kV substation: 168 MW waiting
- Knocknagael 132kV: 350 MW waiting
- Loch na Cathrach 275kV Switching Station: 550 MW waiting
- INVERNESS 132/33KV GRID SUPPLY POINT SUBSTATION: 45 MW waiting
- Ceislien Wind Farm: 86 MW waiting