Linnmill: grid connection queue

Linnmill GSP · SP Transmission (southern Scotland) · register of 26 November 2026

1 project with 20 MW is waiting to connect here (largest by capacity: onshore wind + storage). Contracted dates run from 30 Aug 2032 to 30 Aug 2032.

1project in the queue
20 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Brae WFWIND 2 LIMITEDOnshore wind + storage2030 Aug 2032Low30 Aug 2032Scoping1

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
SymingtonSP Energy Networks7.1 km12 MW3.3 MW
Corra LinnSP Energy Networks9.3 km4.6 MW8 MW
LanarkSP Energy Networks10.4 km26 MW17 MW
Douglas WestSP Energy Networks10.4 km22 MW15 MW
LesmahagowSP Energy Networks12.6 km10 MW15 MW
BiggarSP Energy Networks12.7 km12 MW2.7 MW

Thinking of connecting near Linnmill?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.