Keith 132kV: grid connection queue

Keith 132kV Substation · SSEN Transmission (northern Scotland) · register of 26 November 2026

1 project with 48 MW is waiting to connect here (largest by capacity: battery storage). Contracted dates run from 1 Apr 2029 to 1 Apr 2029.

1project in the queue
48 MWwaiting to connect
0 MWalready connected
48 MWholding Gate 2
1date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Keith 132 Greener Grid ParkKEITH STORAGE SOLUTIONS LIMITEDBattery storage481 Apr 2029Medium1 Apr 2029Under Construction/Commissioning2

Dates that moved

Since 2 Jun 2026, connection dates here moved by a month or more 1 time: 1 later and 0 earlier. An earlier date can mean someone ahead dropped out or the queue was re-ordered.

Week seenProjectWasNowChange
4 Aug 2026Keith 132 Greener Grid Park31 May 20251 Apr 2029+46 months

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Cairnford GSPSSEN Distribution5.3 km
Keith PrimarySSEN Distribution6.8 km0 MW6.4 MW
Keith 2 GSPSSEN Distribution6.9 km
Keith 1 GSPSSEN Distribution6.9 km
Huntly PrimarySSEN Distribution9.1 km0 MW8.1 MW
Limehillocks PrimarySSEN Distribution10.2 km0 MW0 MW

Thinking of connecting near Keith 132kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points