Benzene

Glenrothes 275/33kV: grid connection queue

Glenrothes 275/33kV · SP Transmission (southern Scotland) · register of 26 November 2026

1 project with 46 MW is waiting to connect here (largest by capacity: battery storage). Contracted dates run from 30 Oct 2025 to 30 Oct 2025.

1project in the queue
46 MWwaiting to connect
0 MWalready connected
46 MWholding Gate 2
0date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Glenrothes BESSGLENROTHES BESS LTDBattery storage4630 Oct 2025n/aConsents Approved2

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
CollydeneSP Energy Networks1.1 km19 MW
GlenwoodSP Energy Networks3.1 km19 MW11 MW
QueenswaySP Energy Networks3.1 km21 MW13 MW
Warout RoadSP Energy Networks3.8 km2.5 MW
SouthfieldSP Energy Networks4.7 km20 MW15 MW
PitteucharSP Energy Networks4.9 km12 MW

Thinking of connecting near Glenrothes 275/33kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points