Benzene

Smeaton 400kV: grid connection queue

Smeaton 400kV · SP Transmission (southern Scotland) · register of 26 November 2026

1 project with 228 MW is waiting to connect here (largest by capacity: battery storage). Contracted dates run from 31 Jul 2028 to 31 Jul 2028.

1project in the queue
228 MWwaiting to connect
0 MWalready connected
228 MWholding Gate 2
1date moves since 2 Jun 2026
228 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Smeaton BESSKONA ASSET 3 LIMITEDBattery storage22831 Jul 2028High31 Jul 2030Consents Approved2

Dates that moved

Since 2 Jun 2026, connection dates here moved by a month or more 1 time: 1 later and 0 earlier. An earlier date can mean someone ahead dropped out or the queue was re-ordered.

Week seenProjectWasNowChange
6 Oct 2026Smeaton BESS30 Sep 202731 Jul 2028+10 months

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Birrell Street WyndSP Energy Networks1.1 km24 MW8.3 MW
RedhouseSP Energy Networks1.8 km10 MW10 MW
ChapelSP Energy Networks1.9 km12 MW3.4 MW
Linton LaneSP Energy Networks2.2 km8.3 MW4.4 MW
RaithSP Energy Networks3.0 km22 MW16 MW
Cluny RoadSP Energy Networks3.1 km6.6 MW

Thinking of connecting near Smeaton 400kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points