Glendye Wind Farm: grid connection queue

Glendye Wind Farm Substation · SSEN Transmission (northern Scotland) · register of 26 November 2026

1 project with 167 MW is waiting to connect here (largest by capacity: onshore wind). Contracted dates run from 31 Oct 2028 to 31 Oct 2028.

1project in the queue
167 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
167 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Glendye Wind FarmGLENDYE WIND FARM LIMITEDOnshore wind16731 Oct 2028High29 Dec 2030Scopingnone

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Banchory PrimarySSEN Distribution10.9 km0 MW0 MW
Fetteresso GSPSSEN Distribution14.1 km
Edzell PrimarySSEN Distribution15.8 km0 MW0 MW
Laurencekirk PrimarySSEN Distribution16.4 km0 MW0 MW
Fiddes GSPSSEN Distribution17.5 km
Aboyne PrimarySSEN Distribution17.9 km0 MW0 MW

Thinking of connecting near Glendye Wind Farm?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points