ELSTREE B 275KV SUBSTATION: grid connection queue
ELSTREE B 275KV SUBSTATION · National Grid Electricity Transmission (England and Wales) · register of 26 November 2026
1 project with 500 MW is waiting to connect here (largest by capacity: battery storage). Contracted dates run from 31 Oct 2037 to 31 Oct 2037.
What sits in the queue
Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).
| Project | Customer | Type | MW | Contracted date | Date risk | Likely date | Stage | Gate |
|---|---|---|---|---|---|---|---|---|
| Elstree BESS NP | ELSTREE FLEXPOWER LTD | Battery storage | 500 | 31 Oct 2037 | Low | 31 Oct 2037 | Scoping | 1 |
Dates that moved
No connection date here has moved by a month or more since 2 Jun 2026.
Local network capacity nearby
Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.
| Substation | Operator | Distance | Generation headroom | Demand headroom |
|---|---|---|---|---|
| Park St Primary 11kV | UK Power Networks | 2.5 km | 8.8 MW | 9.5 MW |
| Shenley Primary 11kV | UK Power Networks | 3.4 km | 1.4 MW | 8.8 MW |
| Bushey Mill Grid 33kV | UK Power Networks | 4.6 km | 111 MW | 50 MW |
| Bushey Mill Grid 11kV | UK Power Networks | 4.6 km | 100 MW | 40 MW |
| Hartspring Primary 11kV | UK Power Networks | 4.7 km | 24 MW | 6.2 MW |
| Cell Barnes Grid 33kV | UK Power Networks | 4.8 km | 108 MW | 52 MW |
Thinking of connecting near ELSTREE B 275KV SUBSTATION?
Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.
Ask for a free check See a sample reportPaid screening reports from £1,950. Queue watch alerts you when anything here changes.
Nearby connection points
- Letchmore Heath 132kV: 170 MW waiting
- Jersey Farm 400kV: 400 MW waiting
- London North West Connection Node A 132kV: 200 MW waiting
- Mill Hill 275kV: 57 MW waiting
- London West Connection Node A 400kV: 200 MW waiting