East Kilbride 275/33kV: grid connection queue
East Kilbride 275/33kV GSP · SP Transmission (southern Scotland) · register of 26 November 2026
1 project with 55 MW is waiting to connect here (largest by capacity: battery storage). Contracted dates run from 26 Mar 2027 to 26 Mar 2027.
What sits in the queue
Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).
| Project | Customer | Type | MW | Contracted date | Date risk | Likely date | Stage | Gate |
|---|---|---|---|---|---|---|---|---|
| Rogerton Cottage BESS | DRAX BESS EK LIMITED | Battery storage | 55 | 26 Mar 2027 | High | 25 Mar 2029 | Consents Approved | 2 |
Dates that moved
Since 2 Jun 2026, connection dates here moved by a month or more 1 time: 1 later and 0 earlier. An earlier date can mean someone ahead dropped out or the queue was re-ordered.
| Week seen | Project | Was | Now | Change |
|---|---|---|---|---|
| 21 Jul 2026 | Rogerton Cottage BESS | 19 Oct 2026 | 26 Mar 2027 | +5 months |
Local network capacity nearby
Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.
| Substation | Operator | Distance | Generation headroom | Demand headroom |
|---|---|---|---|---|
| Kelvin | SP Energy Networks | 0.1 km | 15 MW | |
| Common Farm | SP Energy Networks | 1.1 km | 15 MW | |
| Leonards Chapel | SP Energy Networks | 1.5 km | 17 MW | |
| Westwood | SP Energy Networks | 1.8 km | 17 MW | |
| College Milton | SP Energy Networks | 2.7 km | 19 MW | 8.4 MW |
| Hunter | SP Energy Networks | 2.8 km | 25 MW | 16 MW |
Thinking of connecting near East Kilbride 275/33kV?
Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.
Ask for a free check See a sample reportPaid screening reports from £1,950. Queue watch alerts you when anything here changes.
Nearby connection points
- East Kilbride 275kV: 200 MW waiting
- East Kilbride B 275/33kV: 160 MW waiting
- Castlemilk 400kV: 300 MW waiting
- Busby 275kV: 150 MW waiting
- Strathaven 400kV: 800 MW waiting