Dumfries 132/33kV: grid connection queue
Dumfries 132/33kV · SP Transmission (southern Scotland) · register of 26 November 2026
2 projects with 90 MW are waiting to connect here (largest by capacity: solar + storage, battery storage). Contracted dates run from 31 May 2029 to 30 Jul 2030.
What sits in the queue
Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).
| Project | Customer | Type | MW | Contracted date | Date risk | Likely date | Stage | Gate |
|---|---|---|---|---|---|---|---|---|
| Mosspark Energy Park | REG Power Developments Limited | Solar + storage | 50 | 31 May 2029 | Medium | 31 May 2029 | Scoping | none |
| Kellwood Road BESS | Geocore (Kellwood) Ltd | Battery storage | 40 | 30 Jul 2030 | Medium | 30 Jul 2030 | Consents Approved | 2 |
Dates that moved
Since 2 Jun 2026, connection dates here moved by a month or more 1 time: 1 later and 0 earlier. An earlier date can mean someone ahead dropped out or the queue was re-ordered.
| Week seen | Project | Was | Now | Change |
|---|---|---|---|---|
| 8 Sep 2026 | Kellwood Road BESS | 31 Oct 2027 | 30 Jul 2030 | +33 months |
Local network capacity nearby
Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.
| Substation | Operator | Distance | Generation headroom | Demand headroom |
|---|---|---|---|---|
| Maxwellton | SP Energy Networks | 0.5 km | 13 MW | |
| Dumfries 11Kv | SP Energy Networks | 1.3 km | 27 MW | 7.1 MW |
| Lochside | SP Energy Networks | 2.5 km | 11 MW | 7.1 MW |
| Heathhall | SP Energy Networks | 3.2 km | 18 MW | 11 MW |
| Heathfield | SP Energy Networks | 3.2 km | 13 MW | |
| Cargenbridge | SP Energy Networks | 3.3 km | 23 MW | 13 MW |
Thinking of connecting near Dumfries 132/33kV?
Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.
Ask for a free check See a sample reportPaid screening reports from £1,950. Queue watch alerts you when anything here changes.
Nearby connection points
- Dumfries North 400kV: 200 MW waiting
- Dumfries North 400/132kV substation: 43 MW waiting
- Windyhill 275/132kV: 200 MW waiting
- Harestanes West Wind Farm 132/33kV: 119 MW waiting
- Wyseby Hill Energy Farm 400kV: 750 MW waiting