Benzene

Dorenell Extension Wind Farm 400kV: grid connection queue

Dorenell Extension Wind Farm 400kV Substation · SSEN Transmission (northern Scotland) · register of 26 November 2026

1 project with 610 MW is waiting to connect here (largest by capacity: onshore wind). Contracted dates run from 31 Oct 2033 to 31 Oct 2033.

1project in the queue
610 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Dorenell Windfarm ExtensionDORENELL WINDFARM EXTENSION LIMITEDOnshore wind61031 Oct 2033Low31 Oct 2033Scoping1

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Dufftown PrimarySSEN Distribution10.2 km0 MW0.1 MW
Glenfarclas GSPSSEN Distribution13.2 km
Aberlour PrimarySSEN Distribution13.5 km0 MW0 MW
Ballindalloch PrimarySSEN Distribution13.7 km0 MW6.6 MW
Mossat PrimarySSEN Distribution18.2 km0 MW0.1 MW
Strathdon PrimarySSEN Distribution18.4 km0 MW1.9 MW

Thinking of connecting near Dorenell Extension Wind Farm 400kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points