Dorenell BESS 132KV substation: grid connection queue
Dorenell BESS 132KV substation · SSEN Transmission (northern Scotland) · register of 26 November 2026
1 project with 38 MW is waiting to connect here (largest by capacity: onshore wind). Contracted dates run from 31 Oct 2023 to 31 Oct 2023.
What sits in the queue
Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).
| Project | Customer | Type | MW | Contracted date | Date risk | Likely date | Stage | Gate |
|---|---|---|---|---|---|---|---|---|
| Dorenell Battery | CLASHINDARROCH WINDFARM EXTENSION LIMITED | Onshore wind | 38 | 31 Oct 2023 | n/a | Scoping | 1 |
Dates that moved
No connection date here has moved by a month or more since 2 Jun 2026.
Local network capacity nearby
Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.
| Substation | Operator | Distance | Generation headroom | Demand headroom |
|---|---|---|---|---|
| Dufftown Primary | SSEN Distribution | 10.2 km | 0 MW | 0.1 MW |
| Glenfarclas GSP | SSEN Distribution | 13.2 km | ||
| Aberlour Primary | SSEN Distribution | 13.5 km | 0 MW | 0 MW |
| Ballindalloch Primary | SSEN Distribution | 13.7 km | 0 MW | 6.6 MW |
| Mossat Primary | SSEN Distribution | 18.2 km | 0 MW | 0.1 MW |
| Strathdon Primary | SSEN Distribution | 18.4 km | 0 MW | 1.9 MW |
Thinking of connecting near Dorenell BESS 132KV substation?
Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.
Ask for a free check See a sample reportPaid screening reports from £1,950. Queue watch alerts you when anything here changes.
Nearby connection points
- Dorenell Extension Wind Farm 400kV: 610 MW waiting
- CRAIG WATCH WIND FARM 132KV SUBSTATION: 73 MW waiting
- Clashindarroch Windfarm Extension 132kV: 145 MW waiting
- Keith Solar Farm 275kV: 150 MW waiting
- Keith 2 132/33kV GSP: 132 MW waiting