Callisterhall 132kV: grid connection queue

Callisterhall 132kV · SP Transmission (southern Scotland) · register of 26 November 2026

1 project with 46 MW is waiting to connect here (largest by capacity: onshore wind). Contracted dates run from 27 Apr 2029 to 27 Apr 2029.

1project in the queue
46 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
46 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Callisterhall Wind FarmE Power LimitedOnshore wind4627 Apr 2029High14 Mar 2031Scoping1

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
LangholmSP Energy Networks7.5 km-0.5 MW20 MW
MiddlebieSP Energy Networks10.3 km-1.3 MW-0.1 MW
LockerbieSP Energy Networks15.2 km27 MW8.6 MW
GretnaSP Energy Networks17.3 km26 MW16 MW
AnnanSP Energy Networks18.3 km15 MW13 MW
Primary substation 609612Electricity North West19.4 km2.4 MW0 MW

Thinking of connecting near Callisterhall 132kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points