Benzene

Burwell South 400kV: grid connection queue

Burwell South 400kV Substation · National Grid Electricity Transmission (England and Wales) · register of 26 November 2026

3 projects with 507 MW are waiting to connect here (largest by capacity: solar + storage). Contracted dates run from 31 Oct 2032 to 30 Oct 2034.

3projects in the queue
507 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Rat Hall SolarDowning Renewable Developments LLPSolar + storage20031 Oct 2032Low31 Oct 2032Scoping1
ER BUR EnergyER PROJECT DEVELOPMENT CO LIMITEDSolar + storage5728 Oct 2033Low28 Oct 2033Scoping1
Burwell BESSO&G Solar (SPV 38) LimitedSolar + storage25030 Oct 2034Low30 Oct 2034Scopingnone

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Burwell Local Grid 33kVUK Power Networks0.7 km-34.9 MW22 MW
Burwell Primary 11kVUK Power Networks0.7 km-34.9 MW5.2 MW
Exning Primary 11kVUK Power Networks2.9 km-34.9 MW-1.8 MW
Soham Primary 11kVUK Power Networks5.7 km-34.9 MW8.6 MW
Newmarket Primary 11kVUK Power Networks5.9 km-34.9 MW5.2 MW
Landbeach Primary 11kVUK Power Networks10.7 km27 MW16 MW

Thinking of connecting near Burwell South 400kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points