Burwell 132kV: grid connection queue
Burwell 132kV Substation · National Grid Electricity Transmission (England and Wales) · register of 26 November 2026
1 project with 30 MW is waiting to connect here (largest by capacity: battery storage). Contracted dates run from 31 Oct 2028 to 31 Oct 2028.
What sits in the queue
Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).
| Project | Customer | Type | MW | Contracted date | Date risk | Likely date | Stage | Gate |
|---|---|---|---|---|---|---|---|---|
| Weirs Drove | CARE POWER (BURWELL 1) LIMITED | Battery storage | 30 | 31 Oct 2028 | High | 31 Oct 2030 | Scoping | none |
Dates that moved
No connection date here has moved by a month or more since 2 Jun 2026.
Local network capacity nearby
Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.
| Substation | Operator | Distance | Generation headroom | Demand headroom |
|---|---|---|---|---|
| Burwell Local Grid 33kV | UK Power Networks | 0.7 km | -34.9 MW | 22 MW |
| Burwell Primary 11kV | UK Power Networks | 0.7 km | -34.9 MW | 5.2 MW |
| Exning Primary 11kV | UK Power Networks | 2.9 km | -34.9 MW | -1.8 MW |
| Soham Primary 11kV | UK Power Networks | 5.7 km | -34.9 MW | 8.6 MW |
| Newmarket Primary 11kV | UK Power Networks | 5.9 km | -34.9 MW | 5.2 MW |
| Landbeach Primary 11kV | UK Power Networks | 10.7 km | 27 MW | 16 MW |
Thinking of connecting near Burwell 132kV?
Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.
Ask for a free check See a sample reportPaid screening reports from £1,950. Queue watch alerts you when anything here changes.
Nearby connection points
- Burwell South 400kV: 507 MW waiting
- Burwell 400kV: 480 MW waiting
- Burwell Main 400kV: 57 MW waiting
- West Anglia Connection Node E 400kV: 800 MW waiting
- West Anglia Connection Node F 400kV: 3,429 MW waiting