Blacklaw 132/33kV: grid connection queue

Blacklaw 132/33kV · SP Transmission (southern Scotland) · register of 26 November 2026

1 project with 222 MW is waiting to connect here (largest by capacity: onshore wind + storage). Contracted dates run from 8 Oct 2032 to 8 Oct 2032.

1project in the queue
222 MWwaiting to connect
118 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
BlacklawScottishPower Renewables (UK) LimitedOnshore wind + storage2228 Oct 2032Low8 Oct 2032Scopingnone

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
MoffatSP Energy Networks17.0 km8.5 MW3.6 MW
BiggarSP Energy Networks17.2 km12 MW2.7 MW
SymingtonSP Energy Networks18.0 km12 MW3.3 MW

Thinking of connecting near Blacklaw 132/33kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.