Windyhill 132kV: grid connection queue

Windyhill 132kV · SP Transmission (southern Scotland) · register of 26 November 2026

1 project with 200 MW is waiting to connect here (largest by capacity: battery storage). Contracted dates run from 31 Dec 2027 to 31 Dec 2027.

1project in the queue
200 MWwaiting to connect
0 MWalready connected
200 MWholding Gate 2
1date moves since 2 Jun 2026
200 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
WindyHill Energy Storage FacilityWindyhill Grid 1 LTDBattery storage20031 Dec 2027High30 Dec 2029Consents Approved2

Dates that moved

Since 2 Jun 2026, connection dates here moved by a month or more 1 time: 1 later and 0 earlier. An earlier date can mean someone ahead dropped out or the queue was re-ordered.

Week seenProjectWasNowChange
30 Jun 2026WindyHill Energy Storage Facility27 Aug 202531 Dec 2027+28 months

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Abbeylands RoadSP Energy Networks1.3 km11 MW7.7 MW
Hecla AvenueSP Energy Networks2.1 km22 MW16 MW
Craigdhu RoadSP Energy Networks2.5 km16 MW
KilbowieSP Energy Networks2.7 km22 MW12 MW
Drumchapel RoadSP Energy Networks2.8 km23 MW14 MW
Radnor ParkSP Energy Networks2.8 km22 MW14 MW

Thinking of connecting near Windyhill 132kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points