Braidfield Battery Storage 132kV: grid connection queue
Braidfield Battery Storage 132kV Substation · SP Transmission (southern Scotland) · register of 26 November 2026
1 project with 100 MW is waiting to connect here (largest by capacity: battery storage). Contracted dates run from 27 Sep 2027 to 27 Sep 2027.
What sits in the queue
Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).
| Project | Customer | Type | MW | Contracted date | Date risk | Likely date | Stage | Gate |
|---|---|---|---|---|---|---|---|---|
| Braidfield Battery Storage | BRAIDFIELD BATTERY STORAGE LIMITED | Battery storage | 100 | 27 Sep 2027 | High | 26 Sep 2029 | Scoping | 1 |
Dates that moved
No connection date here has moved by a month or more since 2 Jun 2026.
Local network capacity nearby
Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.
| Substation | Operator | Distance | Generation headroom | Demand headroom |
|---|---|---|---|---|
| Kilbowie | SP Energy Networks | 0.4 km | 22 MW | 12 MW |
| Radnor Park | SP Energy Networks | 0.7 km | 22 MW | 14 MW |
| Abbeylands Road | SP Energy Networks | 1.1 km | 11 MW | 7.7 MW |
| Clydebank Business Park | SP Energy Networks | 1.7 km | 12 MW | |
| Hecla Avenue | SP Energy Networks | 2.0 km | 22 MW | 16 MW |
| Drumchapel Road | SP Energy Networks | 3.4 km | 23 MW | 14 MW |
Thinking of connecting near Braidfield Battery Storage 132kV?
Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.
Ask for a free check See a sample reportPaid screening reports from £1,950. Queue watch alerts you when anything here changes.
Nearby connection points
- Windyhill 132kV: 200 MW waiting
- Vale of Leven 132kV substation: 72 MW waiting
- Drumchapel 275/33kV: 60 MW waiting
- Partrick: 63 MW waiting
- Braehead Park 132/33kV: 100 MW waiting