Strathy South 132/33kV: grid connection queue

Strathy South 132/33kV Substation · SSEN Transmission (northern Scotland) · register of 26 November 2026

1 project with 208 MW is waiting to connect here (largest by capacity: onshore wind). Contracted dates run from 30 Sep 2030 to 30 Sep 2030.

1project in the queue
208 MWwaiting to connect
0 MWalready connected
208 MWholding Gate 2
2date moves since 2 Jun 2026
208 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Strathy South WindSSE GENERATION LIMITEDOnshore wind20830 Sep 2030High16 Aug 2032Consents Approved2

Dates that moved

Since 2 Jun 2026, connection dates here moved by a month or more 2 times: 2 later and 0 earlier. An earlier date can mean someone ahead dropped out or the queue was re-ordered.

Week seenProjectWasNowChange
1 Sep 2026Strathy South Wind28 May 202730 Sep 2030+40 months
25 Aug 2026Strathy South Wind25 Apr 202728 May 2027+1 months

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Alness GSPSSEN Distribution4.6 km
Contullich PrimarySSEN Distribution5.0 km0 MW0.1 MW
Crosshills PrimarySSEN Distribution5.6 km0 MW4 MW
Invergordon PrimarySSEN Distribution9.4 km0 MW5 MW
Glastullich PrimarySSEN Distribution14.7 km0 MW0 MW
Tain PrimarySSEN Distribution15.0 km0 MW5.8 MW

Thinking of connecting near Strathy South 132/33kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points