Tod Point 275kV: grid connection queue
Tod Point 275kV Substation · National Grid Electricity Transmission (England and Wales) · register of 26 November 2026
1 project with 860 MW is waiting to connect here (largest by capacity: gas and thermal). Contracted dates run from 30 Jul 2027 to 30 Jul 2027.
1project in the queue
860 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
860 MWat high date risk
What sits in the queue
Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).
| Project | Customer | Type | MW | Contracted date | Date risk | Likely date | Stage | Gate |
|---|---|---|---|---|---|---|---|---|
| Net Zero Teesside Power Project | NET ZERO TEESSIDE POWER LIMITED | Gas and thermal | 860 | 30 Jul 2027 | High | 13 Mar 2030 | Consents Approved | none |
Dates that moved
No connection date here has moved by a month or more since 2 Jun 2026.
Thinking of connecting near Tod Point 275kV?
Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.
Ask for a free check See a sample reportPaid screening reports from £1,950. Queue watch alerts you when anything here changes.
Nearby connection points
- Teeside Connection Node A 132kV: 228 MW waiting
- Teeside Connection Node 2 C 132/400kV: 2,400 MW waiting
- Saltholme 275kV: 200 MW waiting
- Lackenby 400kV: 1,800 MW waiting
- Teeside Connection Node B: 3,600 MW waiting