Benzene

Didcot 400kV: grid connection queue

Didcot 400kV Substation · National Grid Electricity Transmission (England and Wales) · register of 26 November 2026

2 projects with 600 MW are waiting to connect here (largest by capacity: battery storage). Contracted dates run from 31 Oct 2027 to 31 Oct 2028.

2projects in the queue
600 MWwaiting to connect
1,575 MWalready connected
300 MWholding Gate 2
1date moves since 2 Jun 2026
600 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Didcot Energy ParkBROCKWELL STORAGE & SOLAR LIMITEDBattery storage30031 Oct 2027High30 Oct 2029Awaiting Consentsnone
Didcot RoadDIDCOT BESS LIMITEDBattery storage30031 Oct 2028High31 Oct 2030Consents Approved2

Dates that moved

Since 2 Jun 2026, connection dates here moved by a month or more 1 time: 1 later and 0 earlier. An earlier date can mean someone ahead dropped out or the queue was re-ordered.

Week seenProjectWasNowChange
3 Nov 2026Didcot Road31 Oct 202731 Oct 2028+12 months

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Milton PrimarySSEN Distribution1.1 km0 MW0 MW
Fulscot PrimarySSEN Distribution4.1 km0 MW0 MW
Drayton BSPSSEN Distribution4.5 km0 MW0 MW
Culham PrimarySSEN Distribution4.7 km0 MW16 MW
Winsmore Lane PrimarySSEN Distribution5.3 km0 MW0 MW
Harwell PrimarySSEN Distribution6.2 km0 MW39 MW

Thinking of connecting near Didcot 400kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points